East Hill Park Phase 2 Plan

Location: Bridge Street East and Bleecker Avenue, Belleville
Client: East Hill Park Association and City of Belleville
Date: 2012 to Present

  • Assisted in the preparation of an overall master plan for the final phases of a City park.
  • Surveyed existing conditions and reviewed community recreation needs
  • Prepared base plan of existing conditions and proposed new facilities including amphitheatre, barrier-free accessible play equipment, walking paths, benches and signage.
  • Finalized presentation drawing for final phase

P1010069
P1010072
P1010073
P1010076
338-SP-September-06-2012-24-x-36